Dormer and bathroom,
Croydon

Project duration – 6 weeks

Intercraft built a dormer into a first floor pitched roof to create space for incorporating an upstairs bathroom. The bathroom included the installation of a bath, walk in shower, toilet and wash hand basin. The pitch of the roof created an awkward space which was overcame with precision tiling. Underfloor heating was installed, and the team finished off the project with high-end decoration.

Gallery

What work was carried out?

  • Addition of a dormer
  • Installation of bathroom suite
  • Tiling
  • Underfloor heating
  • Decoration

Review

Alex managed the project from start to finish which made life easy for me not having the co-ordinate all the tradespeople. The final result exceeded my expectations. The quality of work is superb and Alex gave advice along the way. I would definitely use them again and 100% recommend them. Thank you.

Contact Intercraft

Let’s take your project to the next level. Call 01342 618 618 or email info@inter-craft.co.uk to find out more about our services. We are always happy to answer any questions.